GF302D PORTABLE THREE PHASE KWH METER TEST EQUIPMENT
URL:
5000
The GF302D portable meter test equipment is used for grid corporation of measurement and energy test center, management department of power supply bureau, national energy measurement of testing authorities, and also used to test each kind of single/three phase kWh meter of industries and mining enterprises as well as electric meter manufacturers. Meanwhile, the meter test equipment also can be used as one high precision standard power source, voltage source and current source. Portable design, used in the laboratory or on site to auto check energy meter error.
Posted by:
GFUVE (Business)
The GF302D portable meter test equipment is used for grid corporation of measurement and energy test center, management department of power supply bureau, national energy measurement of testing authorities, and also used to test each kind of single/three phase kWh meter of industries and mining enterprises as well as electric meter manufacturers. Meanwhile, the meter test equipment also can be used as one high precision standard power source, voltage source and current source. Portable design, used in the laboratory or on site to auto check energy meter error.
Posted by:
GFUVE (Business)
Posted on: 04/24/23 , Total Visits: 549
Location: Worldwide